§ 122-6. Restoration of highway.
Latest version.
-
A.Any such excavation in any highway shall be restored within the time granted in the permit, with materials equivalent to those excavated, and shall be kept and maintained level with the unexcavated portion thereof for a period of one year from the date of restoration, so that said excavated portion shall be left in as good, substantial and permanent condition as before the excavation; and if not so restored and maintained, the work shall be done by or under the direction of the Town of Barton Superintendent of Highways, and the cost thereof shall be a lawful charge against the person to whom the permit was issued or the cash bond hereafter described, and it shall be the duty of the Town of Barton Superintendent of Highways to sue for and recover such costs or pay them with all or a part of said cash bond.B.Any portion of curb and/or gutter which has been destroyed or removed shall be rebuilt and restored to its former appearance, except that if it shall have been removed for the purpose of driveway ingress, it shall be rebuilt with a depressed curb. The restoration or rebuilding of said curb will be completed within 30 days from the date of the permit.C.If the said highway excavation or curb or gutter work is not restored and maintained as aforesaid, the work shall be done by or under the direction of the Town of Barton Superintendent of Highways, and the cost thereof shall be a lawful charge against the person to whom the permit was issued or the cash bond hereafter described, and it shall be the duty of the Town of Barton Superintendent of Highways to sue for and recover such costs or pay them with all or part of said cash bond.